Liability for delay to or contracts incomplete due to any of the following eventualities will not be accepted by us: a. Unsuitable sites. b. The state of the wind or weather. c. Loss or damage by fire or flood. d. Any cause out of our control.
The hirer agrees to: a. Inform us of the presence of drains, pipes, cables, etc. likely to be affected, and to repair or make good the same and to repair any damage to the site generally b. To pay cancellation charges as follows: 75% Less than 7 days notice 50% If less than 28 days notice. 30% If 28 days or more notice. 5% If more than 6 months notice is given. c. Pay a 10% credit charge if payment is not received within 21 days of invoice. d. Pay a 10% deposit on booking non refundable
We reserve the right to charge a deposit to cover part or whole of the equipment hired. All hire prices are quoted subject to the site and subsurface being suitable.
In the event of emergency, we reserve the right to substitute alternative sizes or marquees or other equipment to give as near as possible the equivalent requirements.
All offers for hire are subject to increase, if the site is abnormal and causes increases in labour and/or materials.
We do not accept responsibility for: a. Any damage to equipment placed in marquee. b. Public Liability WE ACCEPT NO RESPONSIBILITY WHATSOEVER for damage or injury to persons or property whilst the equipment is on hire.
We will not be held responsible for any errors or omissions in quotations and contracts and reserve the right to correct errors or omissions at a later date.